Multi-Criteria Decision- Making Modeling of b-type ORCBinary Geothermal Power Plant: EATWOS Analysis

Yükleniyor...
Küçük Resim

Tarih

Dergi Başlığı

Dergi ISSN

Cilt Başlığı

Yayıncı

Erişim Hakkı

info:eu-repo/semantics/openAccess

Özet

In this study, taking the different parameters into account, different designs of b-typeORC power plant have analytically conducted. In the designs, Simav geothermal resourceshave been taken into consideration as the source of the plant. Then, the best design has beendetermined using EATWOS in the viewpoint of the working conditions. As a conclusion, the availablemodels of b1-type, b2-type and b3-type were determined as Model 12, Model 10 and Model 31,respectively for energy efficiency, net yearly electricity generation and integrated-based values.Amongst these, the best model was determined as Model 10 with the design parameters of 353.15 K,413.15 K, 295.15 K, 656.37 MWh and 18.08 for T1b, T2d, T2c, Enet and η, respectively.

Açıklama

Anahtar Kelimeler

Enerji ve Yakıtlar

Kaynak

Bilecik Şeyh Edebali Üniversitesi Fen Bilimleri Dergisi

WoS Q Değeri

Scopus Q Değeri

Cilt

6

Sayı

1

Künye

Onay

İnceleme

Ekleyen

Referans Veren